OverviewThis solution enables slurry agitation in completely covered rafts/ponds without accessing the interior. Its structural design combined with high power provides effective mixing while maintaining the cover's integrity. The motor is mounted at pond level and can be mechanically raised for inspection or maintenance. Fixed, secure construction engineered for long service life.
Design and operationThe Segalés agitation tunnel is a fixed external support installed on the raft bottom and covered by the upper tarp. This layout allows operation and maintenance from outside the cover: agitation is produced by the high-power unit, able to mobilize both solid and liquid fractions. The motor remains protected at low level and is accessible via a mechanical lifting system that does not compromise the cover seal.
ApplicationsDesigned for demanding agricultural operations requiring reliable, easy-to-operate slurry mixing on covered rafts and ponds. Suitable for farms that need external maintenance access and continuous performance.
Gallery- Multiple product and installation images available: tunnel details, raft installation, on-farm setups.
Characteristics / technical specifications- Brand: Segalés
- Product: Support for agitators for raft tunnel covers
- Installation: Fixed external support mounted on raft bottom, covered by upper canvas/tarp
- Motor position: Installed at pond/raft level; elevatable for inspection and maintenance via mechanical system
- Function: Agitation of slurry — mobilizes both solid and liquid fractions
- Maintenance: External access to motor; lifting system allows inspection without removing cover
- Design priorities: Reliability, ease of external maintenance, preservation of seal integrity, durable sealed structure
- Suitable for: Completely covered ponds / covered rafts used in agricultural slurry management